We deliver a total service from design stage to stripout through to complete re-fit: walls, ceiling, lighting, air conditioning, floors, fixtures and fittings, heating, electrics etc. Health and safety planning, assessments and method statements provided.


Office Bathroom Refurbishment
Project: Change outdated and unused bathroom into
updated ladies WC

Duration: 3 Weeks.



 

 



Warehouse Conversion
Project: Reduce warehouse size and reuse space to build a new kitchen and staff room
Duration: 15 days.

  Stage 1: Stripout
Stripout: plumbing, electrics and lighting.
Stage 2: Refit
Refit new electrics and lighting, plumbing, build partition walls, joinery, glazing, plumbing, plastering and painting and decorating.

 

 

Shop Refurbishment
Project:
Complete refurbishment of West End Grocery Store

Duration: 12 Weeks.





  Stage 1: Closure
Complete strip out consisting of suspended plus original ceilings, redundant air conditioning and electrics, checkouts, shop furnishings, plumbing and lighting.



Stage 2: Fit Out

Ceilings, wall panelling, air conditioning, gas and plumbing, electrics and lighting, floor repairs, painting and decorating, bespoke stainless steel units, bespoke cabinet making.


Stage 3: Resume Trading

Resume full trading within 12 weeks.

 

Stage 1: Stripout
Stripout: plumbing,
electrics and Fittings.


Stage 2: Refit
Refit new electrics
and lighting, plumbing,
build partition walls,
joinery, glazing,
plumbing, plastering
and painting and
decorating.

Lay slip-resistant floors.

 


 